I’m a week late in posting these, so pretend this was posted July 1.

We bought the place on June 27. The next day, somebody was already out removing the chimney from the house. Then over the weekend, dad and I went out there to remove the chimney from the wash house.

Our contractor happened by while we were out. He had heard that some concrete blocks would be available at an auction, so he bought them for us for $2 for the whole lot. Should save us some money.

Photos of the place after week 1 are now available.

Here’s one, featuring a vulture sitting on top of the barn: